APEX FENCING(513) 503-1422

How we build: The best work is the part you’ll never see.So we put it in writing.

Five commitments go into every proposal. If any part of it is not met, we come back and make it right.

An open wooden gate with leaf shadows across it

Commitment 01

Posts set deep, in concrete.

Every post is set [36] inches deep in concrete, below the frost line, so the fence stays plumb through Ohio winters.

Frost lifts shallow posts, and a leaning post is the first sign of a fence built to a price. Ours go down [36] inches, in concrete, at [8] feet on center. The depth and spacing are printed in your proposal. If rock or a root stops a hole short, we tell you before we pour, not after.

[36] INGRADE

Post and footing, in section

Set [36] inches below grade, in concrete.

Commitment 02

Named materials.

Your proposal names the lumber grade, [LUMBER GRADE], and the fasteners, [FASTENER SPEC]. Nothing is substituted.

Cedar or pressure-treated pine, by grade, and the fasteners and hardware by spec. Whatever is written in the proposal is what arrives on the truck: lumber grade [LUMBER GRADE], fasteners [FASTENER SPEC]. If a supplier is short, we call you first. We do not swap it quietly.

Cedar fence boards close up, showing the grain and a knot

Commitment 03

On the date we give you.

You get a start date and a finish date in writing, and a call the evening before each work day.

The proposal carries two dates: the day we start and the day we finish. We call the evening before each work day to confirm the crew and the time. If weather moves a date, you hear it from us that day, with the new date.

Evening light falling through the boards of a wood privacy fence onto a lawn

Commitment 04

One fixed price, in writing.

The price in your proposal is the price you pay. It changes only if you change the scope, and only on paper, with your signature.

Stain and gates are inside the price. So are the permit paperwork and the cleanup. If you add a gate or lengthen the run, we write a change in plain words, give you the new total and wait for your signature before we start on it.

A wood privacy fence under trees in evening light

Commitment 05

A yard left clean, and made right.

We haul off every offcut, sweep the work area, and walk the finished fence with you. Anything that is not right, we fix.

Spoil, scrap and packaging leave with us each day. On the last day we walk the fence with you, gate by gate and post by post. A list of anything that is not right goes in writing, and we do not call the job done until the list is empty.

A warm light over a patio at dusk

The process

Four steps, in this order.

Each one leaves a written record, so you always know where your fence stands.

  1. Walk the property

    We walk the line with you, measure it, and note slopes, trees, utilities, gates and access for the crew. We talk through wood, height and style, and look at what your town or HOA allows. You do not need to be sure of anything before we arrive.

  2. Written proposal

    Within three business days of the visit [CONFIRM], you get the proposal in writing. It names the fence, the materials, the price and the dates, and it carries the warranty terms. Read it at your own pace. Ask for changes. Nothing starts until you sign.

  3. Permits and build

    We check the rules for your address, file whatever your town requires, and make sure buried utilities are marked through Ohio’s 811 service before a post hole is dug. Then the crew builds. A typical yard takes [2–4] working days once they start.

  4. Final walk-through

    We walk the whole fence with you, open and close every gate, and look at the finish up close. Anything that is not right goes on a written list. We fix it, and we confirm it with you.

The proposal

What a proposal contains.

Everything above, on paper, in plain words. You read it, ask for changes and sign it. Nothing starts before that.

  • Your address and a plain description of the scope
  • Fence type, height and style, with the length in feet
  • Named lumber grade ([LUMBER GRADE]), fasteners ([FASTENER SPEC]) and gate hardware
  • Post depth ([36] inches) and spacing ([8] feet on center)
  • Where each gate goes, and the stain that will be used
  • One fixed price, with stain and gates inside it
  • A start date and a finish date
  • The permits your address needs, and who files them
  • The written warranty terms
  • Signature lines for you and for Apex

Request an estimate

Every fence begins with a walk around the yard.Let’s take yours.

Tell us where the fence goes. We reply within one business day, visit the property, and put one fixed price in writing.

Call (513) 503-1422Request an estimate